Following the recent enquiry from our client in Newbury to our service team, the request to design the installation of 2no. Twin Split #daikin AC Units and 1no. VAM #daikin Unit. The small works team Installed all works which included all pipework, ductwork and electrical power to the outdoor units inclusive of interconnecting of the units. #hvac #hvacservice #hvacr #design #hvaccontrols #hvacinstall #hvacmaintenance #hvaccontractor