Oxford AHU project

Oxford AHU project

AES Maintenance have recently provided a turnkey solution to replace the existing supply and extract AHU for a site in Oxford. Inclusive of decommissioning, install, BMS controls and commission. The products were supplied by EXI-TITE Ltd and Daikin UK. A new Vortice...
Decommission the old ready for the new

Decommission the old ready for the new

The projects team have been up against a very tight timescale in decommissioning an existing chiller, providing a temporary chiller with connections in preparation for a free issue chiller by the client. The works involved; Drain down Existing chiller and remove...
St. George Hospital Case Study

St. George Hospital Case Study

Mechanical maintenance works The AES Projects team have recently completed the replacement  of a pocket of pump sets with new Grundfos pumps. Additional to this was a pressurisation unit with the supply and commission of a side stream filtration water treatment units....
Century Link Case Study

Century Link Case Study

CRAC unit replacement Within the live data hall 5 No Liebert / Hiross twin circuit downflow units were decommissioned and removed from site in phased programme to maintain cooling within the data hall. 5 No HiRef NADR  0902 downflow units operating on R410A...