Operations Base Block K NDT AES Maintenance were engaged to design, supply and install a Daikin 3 Pipe VRV system providing simultaneous cooling and heating. The system comprised of a REYQ16T 16 Hp external condenser and 10 wall mounted fan coil units located within...
Following the recent enquiry from our client in Newbury to our service team, the request to design the installation of 2no. Twin Split #daikin AC Units and 1no. VAM #daikin Unit. The small works team Installed all works which included all pipework, ductwork and...
The project team have just completed a job for our client in Cambourne, its great how a project starts, then grows arms and legs. Original scope was to supply 2 No Panasonic 12.5 kW under ceiling cassettes and external condensers. We was then tasked to modify extract...
‘The Best Service Management Solution’ Joblogic’s mission is that of consistent progress. Whatever your maintenance industry, our field service management software offers a full complement of features that will simplify your workflows and eliminate all...
This week 2 of our senior chiller engineers have carried out the replacement of an aged, obsolete Carrier ProDialog controller, install a modern Carel system. As part of the works, the refrigerant charges were weighed out of 2 chillers and leaks repaired, before they...
Replacement Chillers & Pumps including full flush and commissioning AES Maintenance Ltd were asked to carry out the install of two 1.4 MW free issued chillers up into a purpose made enclosure and then to design and install the primary circuit pipework including...