NEWS

Oxford AHU project

Oxford AHU project

AES Maintenance have recently provided a turnkey solution to replace the existing supply and extract AHU for a site in Oxford. Inclusive of decommissioning, install, BMS controls and commission. The products were supplied by EXI-TITE Ltd and Daikin UK. A new Vortice...

Decommission the old ready for the new

Decommission the old ready for the new

The projects team have been up against a very tight timescale in decommissioning an existing chiller, providing a temporary chiller with connections in preparation for a free issue chiller by the client. The works involved; Drain down Existing chiller and remove...

Jonix Cube protecting the AES Maintenance Ltd office

Jonix Cube protecting the AES Maintenance Ltd office

Jonix Cube uses an advanced oxidation process for the decontamination of air induced by non-thermal plasma, also called cold plasma. Cold plasma is a physical phenomenon generated at room temperature.  Plasma is an ionized gas consisting of various electrically...

St. George Hospital Case Study

St. George Hospital Case Study

Mechanical maintenance works The AES Projects team have recently completed the replacement  of a pocket of pump sets with new Grundfos pumps. Additional to this was a pressurisation unit with the supply and commission of a side stream filtration water treatment units....

Century Link Case Study

Century Link Case Study

CRAC unit replacement Within the live data hall 5 No Liebert / Hiross twin circuit downflow units were decommissioned and removed from site in phased programme to maintain cooling within the data hall. 5 No HiRef NADR  0902 downflow units operating on R410A...

British Airways Case study

British Airways Case study

Operations Base Block K NDT  AES Maintenance were engaged to design, supply and install a Daikin 3 Pipe VRV system providing simultaneous cooling and heating. The system comprised of a REYQ16T 16 Hp external condenser and 10 wall mounted  fan coil units located within...

Small works team complete install in Newbury

Small works team complete install in Newbury

Following the recent enquiry from our client in Newbury to our service team, the request to design the installation of 2no. Twin Split #daikin AC Units and 1no. VAM #daikin Unit. The small works team Installed all works which included all pipework, ductwork and...