This week 2 of our senior chiller engineers have carried out the replacement of an aged, obsolete Carrier ProDialog controller, install a modern Carel system. As part of the works, the refrigerant charges were weighed out of 2 chillers and leaks repaired, before they...
Replacement Chillers & Pumps including full flush and commissioning AES Maintenance Ltd were asked to carry out the install of two 1.4 MW free issued chillers up into a purpose made enclosure and then to design and install the primary circuit pipework including...
Cooling solution AES Maintenance was tasked with providing a cooling solution to meeting rooms throughout the building including one located on the top of the RAC Bristol building, the installation part of the project was not dissimilar to other installs apart from...
Chiller Replacement AES Maintenance Ltd was tasked with replacing two chillers running on obsolete R22 refrigerant gas and replace with newer units. After discussions it was agreed to install 2x 90kw heat recovery units which provides ample cooling for the critical...